(Contents not for circulation, reproduction and official use. It's just sharing for the personal thoughts)
Tuesday, May 17, 2011
Thanks TEAM BURDWAN for the good show
Sunday, May 01, 2011
Route March and Foot March by DM SP in Ketugram
Saturday, April 02, 2011
Subdivisional meeting at Asansol will be held on 12th April 2011 instead of 9th April
100 column report of all ROs received
Katwa Meeting will he held on 10th April, instead of 4th April
Thursday, March 31, 2011
Subdivisional level meetings of DEO/ SP Burdwan from 4th April to 8th April 2011
-
Katwa : 4th April from 10.30 am to 1.30 pm with ROs/BDOs followed by orientation cum interaction with sector officers and tagged police officers at 3 pm as convenient to Subdivisions. Police Officers of OC, IC rank from Police Stations, CIs, SDPOs/ DySP and Addl SP may be invited to join at 12.30 pm. Police Officers shall also attend joint briefing of Sectors at 3 pm for one hour, thereafter, ROs may continue meeting with sector officers.
-
Kalna : 5th April 2011 as above
-
Sadar North & Sadar South : 6th April 2011 as above.
-
Durgapur : 8th April 2011 as above
-
Asansol : 9th April 2011 as above
Shri Tushar Pathak OC Statutory cell is preparing material for Sector Officers meeting in consultation with OC Election and others under guidance of ADM Election. It will be emailed to all SDOs/ ROs by 3rd April 2011 for distribution among the SOs. SDOs to please make arrangements for the meeting, PowerPoint (ADM Election to so for Sadar) and convene the meeting. DM, SP and ADM in charge of the Subdivision will attend the meetings.
All ROs must email their 100 column reports by 1st April 2011 evening positively. Report need not be descriptive and must be in format only.
Monday, March 28, 2011
Tuesday, March 15, 2011
Replies of candidates or Political functionaries must be obtained within 24hrs
Meeting of Committee constituted by CEO at district level to review preventive steps to make environment conducive for free and fair elections held
Shifting of Polling Stations and Auxilliary Polling Stations approved by ECI.
EVM awareness must be started from 16th April 2011
Polling Personnel randomisation to take place on 1st April 2011, instead of 3rd April 2011 decided earlier
Monday, March 14, 2011
Sunday, March 13, 2011
All public property defacements must be removed by 14th evening
Vulnerability exercise - visit to vulnerable families at their door step
Sunday, March 06, 2011
Election preparedness meeting at 4 pm at Asansol today with All ROs, SDO and ADM Asansol
Friday, March 04, 2011
Visit to Katwa Subdivision on 5th MArch 2011 to review Election preparedness
- AC wise control rooms are functional. One senior officer as Nodal officer may be engaged at control room duty in shifts to coordinate all the works of Model Code of Conduct, Expenditure Monitoring, Media Monitoring on MCC + Expenditure and complaint monitoring under whose direction VST, VT, Accounting Team (AT), Flying Squads and Control Room information flow shall function. He will update the RO on all the matters and also prepare necessary reports, notices, show cause etc for the signature of RO. He will also ensure maintenance of single Register AC wise for complaint monitoring and shadow expenditure register with the help of personnel appointed therein.
- All reports, CDs from VST, Media Team, Control Rooms must come to RO's control room daily.
- 20-25 % of vehicles required for the use of sectors can be hired with immediate effect.
- Continuous updation applications received till 28th February 2011 must be disposed off within N-8 and entered in the Electoral Roll database provided for the purpose. EPIC maximisation must also be undertaken by all ROs within this period. This year second supplement will contain EPIC number of electors allowed under continuous updation.
- VM and LOR mapping as per latest instruction of ECI to be started immediately by sectors. They must be thoroughly briefed about the exercise and one to one meeting with Police Stations must be facilitated by ROs/ BDOs. This report must reach district by 16th March 2011 positively.
- Daily MCC notices to violators must be issued and removal of defacement must be improved.
- Repair and maintenance of polling stations and counting centres must be undertaken out of existing funds of SSM, TSC and development funds and must be completed well in advance. List of polling booths requiring sinking re sinking of tube well must be sent to district from SDO's end so that permission may be accorded.
- Booths may be identified among the critical booths for web casting and necessary infrastructure may be assessed. Number was indicated in the meeting.
- LOR issues were discussed and necessary instructions were given to SDPO and SDO Katwa as regards to safe return of homeless/ ousted persons from Ketugram and Mangalkote villages. Most of the families returned and only few left to be returned safely.
All ROs please activate MCC teams
Civil Police meeting on 11th March 2011 - modified schedule
Thursday, March 03, 2011
Meeting with Police Stations and Block officers at 11 am onwards on 11th March 2011
Counting centre deatils received from all ROs - some clarifications
- There can be two halls per AC with ceiling of 14 table each. In ACs where number of booths including auxiliary is less than 224 i.e. rounds can be completed in 16, only one hall per AC with 14+1 table may be allowed. In other cases, two halls will be allowed with as many tables as planned to complete the counting in 12 to 16 rounds.
- Some ROs have proposed less than 8 tables in a hall that is not permissible. They must resubmit the plans afresh. Similarly, more than 14 tables are also not allowed.
- Detailed maps, information sheet must be sent in original in two copies with signature of ROs/ SDOs.
- Strong room and halls must be in the same building/ premises.
- Media centre must be located in the same premises at prominent location.
- Each hall must have provision for installation of computers for compilation of form 20.
- DCRC and counting centre must be at the same location. In some cases, it is not possible due to parking space constraints at counting centres. ROs must send justification in remarks column so that the plan can be approved by ECI.
Wednesday, March 02, 2011
All Political party meeting at 12 noon on 4th March 2011 followed by Press Briefing regarding MCC
Latest circular on Model Code of conduct - issued by ECI on 1st March 2011
Action taken on Vulnerability received - report must be in format only
Tuesday, March 01, 2011
Model Code of Conduct has come into effect from 1st March 2011 - all please follow strictly
With the announcements of General Elections to West Bengal Legislative Assembly 2011, MCC has come into effect from 1st march 2011. Please ensure that it is followed strictly and in letter and spirit. MCC teams must be activated, control rooms at RO level must start functioning forthwith and daily monitoring of Media reports must be done by ROs. Some of the important extracts from MCC are noted herein for guidance :-
MODEL CODE OF CONDUCT
AREAS OF APPLICATION
1) Execution of welfare schemes and Government work 2) Publicity/campaign on welfare schemes and Government work 3) Appointment, transfer and posting of Government officials 4) Use of Rest house, Dak Bungalow and other Government accommodation 5) On misuse of official vehicle
Prohibition or ban on following activities after commencement of MCC
• Announcement of new project or programme of concessions or financial grants in any form or promises thereof • Laying of foundation stones • Fresh or new sanction of any Governmental schemes • Review of progress of development works by political executives, Ministers • Processing of beneficiary oriented schemes, even if it is ongoing • Fresh or new release of any fund of welfare schemes • Work under MPLAD, BEUP will also come under this restriction • No new work shall start in the field after enforcement of MCC even if work order is issued to contractor before MCC came into effect • Tenders are not to be finalized during the election process [Instruction S. No.1 of compendium Vol.-3. ECI letter No.464/INST/2007-PLN-l dated 07.01.2007 & Instruction S No 15 of compendium Vol-3. ECI letter No.437/6/2004 dt 9.3.2004]
Certain exception (Works which are permitted with prior approval of ECI)
• Relief work for the people suffering from emergency situations viz occurrence of flood, drought, earthquake, other natural calamities and accidental cases of the fire and other unforeseen calamities • Welfare measures for the aged and infirm persons (viz. Pension cases and others) • Provision of drinking water by way of water tankers, digging of bore wells and dug wells in scarcity areas This work can only be undertaken by Government functionaries. No Minister of Government of political functionaries can be associated in such management of drought relief. [Instruction S. no.16 of compendium Vol-3 ECI letter No.437/6/23/2004-PLN-lll dated 11.3.2004]
Special provisions for certain schemes
IAY
• Beneficiaries who have been sanctioned IAY in 1st installment can be given second installment • Fresh sanction of new beneficiaries can't be given
SGSY
• Only those SHGs which have received part of their subsidy / grant can be provided balance installments • No fresh individual / group can be given financial assistance [Instruction S No.18 of compendium Vol-3 ECI letter No.437/6/16/2003/PLN-lll dated 01.04.2004]
MGNREGA
• The job card holder will be provided wage employment, if they demand, in ongoing works • If no employment can be provided in ongoing work, new work can be taken up from shelf of approved schemes keeping the DE$O informed • No new work shall be started till there is scope of engaging job seekers in the ongoing project • In case no shelf of project is available or all works in the shelf are exhausted then programme officer will have to move to commission through DEO for getting approval for new work [Instruction Sl No31 of compendium Vol-3 ECI letter No437/6/2006/PLN-lll (Vol.lll) dated 16.3.2006]
Release of fund under MPLAD/BEUP• No fresh release of fund can be made • No work can be started even if work order is issued prior to introduction of MCC but not started in the field • No new work order can be issued • Only the works which are ongoing can continue • There is no bar on release of payments subject to full satisfaction of the authority • [Instruction Sl No.21,52 & 54 of compendium Vol-3 ECI letter No.437/6/2004/PLN-lll dated 26.8.2004, 576/17/84 dated 9/11/1984 & No 437/7/2004-PLN-III dated 29.2.2004]
Permissible Activities
• Work physically started before commencement of MCC can continue
Other Provisions
• Financial institutions funded partially or wholly by the State Govt. should not take recourse in writing off loans, enhance financial limits by indiscriminate issuing of loans [Instruction S No 12 of compendium Vol-3 ECI letter No437/6/2002/PLN-lll dated 25.1.2002]
• No demolition/eviction drive can be carried out by any Govt./civic agencies
• In case such demolition is to be carried out as per order of the court of law, the matter should be brought to the notice of Commission first [Instruction S No 13 of compendium Vol-3 ECI letter No437/6/3/2004/PLN-lll dated 19.2.2004]
Review of Development work
• No official video conferencing should take place between the Ministers and union of State Govt. and other political functionaries [Instruction S No 29 of compendium Vol-3 ECI letter No437/6/3/2004/PLN dated 30.12.2004]
2. PUBLICITY /CAMPAIGN ON WELFARE SCHEMES & GOVERNMENT WORKS
• Ban on display of advertisements and hoarding at the cost of public exchequer. • All such hoardings, advertisements previously displayed are to be removed. • No such advertisement can be issued in newspaper or any other media including electronic media at the cost of public exchequer. • Only hoarding, advertisement which carry general message to the masses on family planning, social welfare schemes etc. may be allowed to be displayed. (Instruction S. No. 14 of compendium Vol.3. ECI letter No. 437/6/2004-PLN-III dated 08.03.2004) • Release of advertisement on pulse polio programme is allowed. • Photographs of political leaders in such advertisement should be avoided. (Instruction S. No. 26 of compendium Vol.-3. ECI letter No. 437/6/Misc./2004-PLN-III dt. 08.01.2004)
3. Appointment, transfer and posting of officials : Ban on following activities :
• Total ban on transfer of RO, ARO and other Revenue Officers connected with conduct of Election. • Total ban on transfer of Police Department Officers connected with management of election and other police officers who are deputed to the commission under section 28A of RP Act-1951. • Total ban on other officer drafted for election work like sector & zonal officers and others who have a role in the management of election. • Transfer orders issued prior to date of announcement of poll but not implemented should not be given effect to after announcement of poll without obtaining specific permission from the commission. • No appointment or promotion in Government / PSUs without prior clearance of the commission can be given.
Exception : In case where transfer is considered necessary for administrative exigencies, prior clearance from commission is mandatory.
4. Restriction on use of Rest House, Dak Bungalow and other Government accommodation :
• Such accommodation shall not be monopolized by the party in power. • Allotment policy should be fair. • It should never be used as campaign office or for holding any public meeting. • Only temporary stay (boarding and lodging) is allowed. • Even casual meeting by members of Political Parties are not permitted. • Only the vehicle carrying the person for accommodation and not more than 2 other vehicles are permitted inside the compound of the Guest House. • Rooms should not be made available for more than 48 hours to any single individual. • These will be freeze on such accommodation 48 hours before the close of poll. (Instruction S. No. 8 of compendium Vol.3. ECI letter No. 437/6/38/2004/PLN-III dated 06.04.2004)
• Ban on utilization of various State Guest Houses, Bhabans and Sadans for election related activities by the Political Parties (Holding of party meeting / Conference etc.) • No restriction on use of such Bhabans for accommodation proposes for officers & others visitors. • Allocation of room should be done in a fair and equitable manner. (Instruction S. No. 4 of compendium Vol.3. ECI letter No. 437/6/98/PLN-III dated 08.01.1998)
5. ON MISUSE OF OFFICIAL VEHICLE
Official vehicles cannot be used for electioneering work, “Official Vehicles” include all vehicles belonging to the :
• Central Government. • State Government. • Public Undertakings of the Central and State Government. • Joint Sector Undertakings of Central and State Government. • Local Bodies, Municipal Corporation, Municipalities. • Marketing Boards (by whatever name known). • Co-operative Societies. • Autonomous District Councils, or • Any other body in which public funds, howsoever small a portion of the total, are invested, and also • Vehicles belonging to the Ministry of Defence and the Central Police Organizations under the Ministry of Home Affairs and State Government.
For clarifications contact Statutory cell or MCC cell.
Monday, February 28, 2011
Election meetings at District level at 10.30 to 11.30 am daily and 6 pm to 7 pm evening wrap up with ADMs
CEO's meeting with ADM Elections and DMs on 3rd March 2011 at Kolkata - reports on election preparedness to be sent from SDOs please
Attention all ROs - expenditure monitoring teams training, DCRC counting venue and control room for MCC should be finalised early
- Read new circular on Expenditure Monitoring and send names of Video Viewing teams (VVT), Video Surveillance team (VST), Accounting Teams, Static squad (SS) and Control Room cum MCC teams names to training cell to organise training. Complete training by 3rd March 2011.
- Rates of expenditure items must be collected and sent to District Expenditure Monitoring Cell at district.
- Provide phone numbers of control room and media centres.
- DCRC venue list must be emailed to OC Election today by 5 pm positively.
- Counting centre venues with number of halls, tables each AC must be emailed today. Maximum rounds 12 to 13 and table 14 in a hall, with two halls each AC should be taken into consideration.
Daily meeting at DM & DEO level at 10.30 am with election section and at 6 pm daily with ADMs to start wef 1st March 2011. All may please note.
Tuesday, February 15, 2011
Training of ROs at Burdwan from 15th to 16th February 2011
Monday, February 14, 2011
All ROs please prepare Calendar of activities with ref to Press Note.
Friday, February 11, 2011
Salient decisions of meeting with BDOs, SDOs today
- All Bdos must come into election mode now. Ensure that the election office in block and Subdivision offices are strengthened with the presence of efficient and active staff, email connectivity and system of regular checking of emails by the BDOs personally, all reports through email only.
- All officers must keep a copy of Sector Officers check list and ROs check list with him, carefully read these in addition to compendium on conduct of elections.
- Sector personnel to be identified and appointed as such by ROs before 21st February so that their training may be started. Collect images for issuing photo ID cards to all of them during the training. Sub sectors can be formed wherever number of booths in a sector is greater than 10 booths including auxiliary. Sub sector can be manned by LDA rank staff.
- Update the information on polling stations, auxiliaries, premises, verification of PSLs and follow up on shortcomings in infrastructure on drinking water, sanitation, doors & windows, approach roads and double entry exit out of SSM, NREGA, TSC and other development funds.
- Distribute all EPICs, destroy defected and old EPICs, plan coverage of non image and non epic electors. Target 100 % status.
- Follow up on Vulnerability mapping, arrest of wanted, NBW executions, confidence building measures etc. Close liaison with Police is emphasised.
- Identify teams for MCC, Expenditure monitoring, video squads well before announcement of elections and get them trained.
- Take preparatory steps for immediate implementation of MCC immediately after press note.
- Polling personnel database must be refined to filter names who are required to be exempted based on health problems and get them examined at Medical Board well in advance. No need to compel bed ridden employees to appear before the board. Rather, authenticated treatment documents may be examined by Board. Thorough checking of data is also required.
- All staff and officers under orders of transfers must be released.
- Continuous updation work to be undertaken at ERO level, not at the block. Update register and pass specific orders.
- Finalise routes and map of the routes for GIS purpose.
Formal minutes will be issued from election section.
Thursday, February 10, 2011
Follow up on the Chief Minister's VC
- Caste certificate disposal in Burdwan is one of the best in the state. Appreciation to all associated with the process. However, more number of camps to be organised in minority dominated areas of OBCs and ST/SC for submission of applications on the spot, checking the same and issue of caste certificate in 25 days cycle as explained to SDOs earlier. Each SDO to organise one big programme for distribution of certificates within this month at Subdivision level for cases prepared over two weeks.
- Pensions are provided to 1.27 lakhs of families in Burdwan district under different departments of State Govt. Efforts are there to release funds upto March 2011. All payments must be made in time immediately on getting the funds. Monitor the filling up vacancies and identification of new cases under widow and disability categoriies.
- Provident funds schemes for unorganised sector were also discussed with SDOs today. Review with ALCs to cover more prople under SASPFUW, BOCW, Transport Workers schemes and PROFLAL. More camps for enrolment to be organised.
- Review food related issues and Ration card replacements with SCFS.
- Forest Rights Patta work is good and complete in Burdwan.
Election meeting with BDOs at 3 pm on 11th February 2011
Thanks all for timely submission of Vulnerability Mapping of all Booths
Tuesday, February 08, 2011
Useful visit to Ketugram Police Station and areas to assess law and order situation
Monday, February 07, 2011
Tuesday, January 25, 2011
Thanks all Election Managers, BLOs, block teams of BDOs and Subdivision teams of SDOs for successful NVD
- 504 booths in Sadar North where 27378 persons attended and 17751 EPICs were distributed to new voters.
- 888 booths in Asansol where 45000 persons attended and 41000 EPICs were distributed to new voters.
- 591 booths in Kalna where 28000 persons attended and 22000 EPICs were distributed
- Katwa 6775 EPICs distributed as per initial reports.
- 927 booths in Durgapur where 15000 persons attended and 14120 EPICs were distributed.
- and 7414 EPICs were distributed in Sadar South as per initial reports.
- Thus, total 109060 EPICs were distributed and voters felicitated at around 3900 booths as per preliminary reports.
All SDOs please send detail reports in format. Please also ascertain the number of booths where NVD was not organised and identify the BLOs who failed to perform their duties. We must fix responsibility, if it is found that election officials did not take steps to organise NVD.
My best to all and hope that we achieve 100 % EPIC before Feb 2011 end.
NVD organised at Kalna Shyamsunder Vidyapith
Monday, January 24, 2011
Monthly development meeting on 11th Feb 2011 at 10.30 am
Video Conference on Caste Ceritificates and Forests Rights Act on 9th Feb 2011
National Voters day - EROs to review arrangements
- All EPICs to be distributed have been checked and found error free, replace erroneous ones.
- All electors whose EPICs will be distributed are intimated personally by BLO of the booth.
- All publicity matters, badges, oath forms etc reaches BLO in time.
- All recognised political parties are intimated by phone also be ERO to attend AC level function.
- ERO must please review the arrangements.
DEO Burdwan shall attend at Kalna where district level programme is being organised.
Sunday, January 23, 2011
Press Release on National Voters' Day on 25th January 2011 at 12 noon
- Press Release The Election Commission of India has decided that 25th January every year will be observed as National Voters’ Day (NVD) through out the country as a measure to encourage citizens to participate in democratic electoral process. ECI orders in this regard have been circulated to all concerned.
- Brief ceremonies will be organized on that day at District, Sub-Division, Block & Booth levels with the following programmes. The District level programme is being organized by the Sub Divisional Officer, Kalna at Shyamsunder Vidyapith, Kalna PS No 264/144 and 264/145.
- Booth Level functions will generally be held at Booth premises.
- Newly eligible and newly registered voters will be felicitated in these ceremonies.
- EPICs will be distributed to the newly registered voters. In total 124011 numbers of EPICs will be distributed throughout the District from booth level.
- Badges with ECI’s logo will be given to newly registered Electors.
- A pledge will be taken by all the citizens attending the ceremony. Form-6 (For inclusion of name in voter list) & Form-8 (For correction of entries in voter list) will be given during the function to persons needing any of the forms.
- Vigorous campaign has already been launched through posters, banners etc. as well as other means of publicity.
- Continuous updation for Inclusion / Deletion / Modification has been started & shall continue till the last date of submission of nomination for the purpose of West Bengal Assembly Election 2011.
- Electors without EPIC card can collect 001C form from BDOs/EROs and submit the same with 2 Copies of Colour Photograph to the concern Designated Officer.
- Any person willing to enlist his/her name in the Voter List or requiring any correction with respect to his/her name in voter list can collect respective form from the SDOs/EROs/BDOs. Properly filled up forms along with supporting documents may be submitted to concerned E.R.O offices for disposal under continuous up-dation.
Saturday, January 22, 2011
All SDOs please celebrate Netaji Subhas Jayanti at all Subdivision
Friday, January 21, 2011
VC with all SDOs, ROs of Burdwan today - decisions
- All ROs to set up email checking system in their offices and also strengthen office management, including posting of personal staff to ROs.
- All polling station reports of shifting, verification, sector proposals etc to reach OC Election by 27th January 2011.
- NVD to be organised at all booths, EPIC distribution to be maximised through BLOs and wide publicity. Ensure presence of all political parties.
- All ARO/ RO proposals to freeze and final.
- Disposal of Continuous updation forms on weekly basis and send report through email.
- Follow up on LOR issues as per decisions of meeting on 16th January 2011 at CH Burdwan, improve performance of security proceedings.
- Meeting with OCs and BDOs by all ROs in next week to finalise sectors, complete VM and follow up on LOR.
- Complete verification of PP database and send data to district by 31st January 2011.
- Send proposals of DCRC by 31st January 2011 after discussing with police.
- All reports and circulars through email/ soft copies only, avoid fax reports.
Meeting with Police Officials on 25th January 2011 at 3 pm
Please send gmail accounts to my email
Thursday, January 20, 2011
Executive Magistrate court functioning must be effective and decisive to extend relief promptly
NVD on 25th January 2011 - DEO Burdwan attends at Kalna
Wednesday, January 19, 2011
Continuous updation applications must be disposed off in time - EROs please note
Meetings to review Election preparedness on every Friday at 4 pm through VC
- Intensification of photo coverage by 25th January 2011, preparation of EPICs and their distribution.
- National Voters Day celebrations - organise functions at each AC level by RO, at Subdivision by SDO and Booths by BLOs.
- Execution of NBW, Preventive actions and Vulnerability Mapping.
- Reports on Law & order issues and review of investigation of cases.
- Finalisation of sectors, booths and DCRC locations.
- Polling personnel database and manpower planning
- Collection of gmail accounts of all ROs and Group mail system.
- Misc issues